Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 7 results ...

Aldhaheri, M, Bakchan, A and Sandhu, M A (2018) A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects. Engineering, Construction and Architectural Management, 25(09), 1226–52.

Chan, A P, Yang, Y and Gao, R (2018) Factors affecting the market development of steel construction. Engineering, Construction and Architectural Management, 25(09), 1146–69.

Meng, X and Brown, A (2018) Innovation in construction firms of different sizes: drivers and strategies. Engineering, Construction and Architectural Management, 25(09), 1210–25.

Oswald, D, Zhang, R P, Lingard, H, Pirzadeh, P and Le, T (2018) The use and abuse of safety indicators in construction. Engineering, Construction and Architectural Management, 25(09), 1188–209.

Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of Last Planner System®: a case study. Engineering, Construction and Architectural Management, 25(09), 1110–26.

Wang, L, Zhang, P, Zhang, P, Li, R, Zhang, Y and Wu, Y (2018) A systematic approach for public-private partnership projects CSFs evaluation. Engineering, Construction and Architectural Management, 25(09), 1127–45.

  • Type: Journal Article
  • Keywords: Management; Case study; Engineering; Approach;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-05-2017-0083
  • Abstract:
    Public–private partnership (PPP) projects are increasingly significant in many countries. The purpose of this paper is to assess the impact of critical success factors (CSFs) on PPP projects and comprehensively consider the interrelations and interaction among dimensions and factors to achieve a better understanding of PPP project management. Design/methodology/approach An evaluation index system for PPP projects such as the presented case study is proposed based on a literature review and a survey. Then, interpretative structural modeling is used to transform the CSFs dimension into a multi-level hierarchical model to reflect the driven-dependency relation of each dimension; the fuzzy analytic network process model optimized by moment estimation theory is used to investigate the impact of CSFs by considering their internal impact. Findings Regarding the project used as the case study, the driving force and dependence for driving layer and dependent layer are determined. Moreover, in driving layer, efficient and well-structured payment mechanism is the most important CSF if considering the internship and interaction among CSFs, and efficient and well-structured payment mechanism and good governance provide most positive interaction; in dependent layer, population of beneficiaries is the most important CSF if considering the internship and interaction among CSFs, and public client’s satisfaction provides most positive interaction. Originality/value This paper developed an evaluation model to explore the interrelationships of dimensions and factors and then determine the impact of CSFs. The model propose in this paper relaxes the independence assumptions of traditional methods and is more in line with reality; besides, weighting method is optimized to obtain more objective and reasonable evaluation results. Through an empirical study, the validity of the model has been verified; therefore, the study can help project stakeholders better understand the CSFs and further improve project performance.

Zhao, X, Wu, P and Wang, X (2018) Risk paths in BIM adoption: empirical study of China. Engineering, Construction and Architectural Management, 25(09), 1170–87.